University of Wisconsin–Madison · Department of Kinesiology

Under construction

Lab Space

Two adjoining suites on the second floor of the Service Memorial Institute, being rebuilt as one working unit for human vascular studies and the sample work that goes with them.

The space

The VSPR Lab occupies two adjoining suites at 470 North Charter Street, in a building that opened in 1926 and still carries its original concrete structure overhead. The remodel takes roughly 1,100 square feet of older laboratory space and rebuilds it as eight connected rooms.

The arrangement follows the way a study visit actually runs. A participant arrives from the corridor, changes in a private room, and is tested in one of two clinical research bays. Blood samples move a few steps down an internal passage to the wet lab rather than across a building. Consent and interviews happen in their own room, away from the equipment and the noise.

Two walls are doing something specific. The walls that separate Clinical Research Bay 1 from the wet lab and from the changing room are built as a rated acoustic assembly, insulated and carried all the way to the underside of the concrete deck, so a measurement in the bay is far less exposed to the rest of the suite.

Project area
1,137 sq ft
Rooms
8
Clinical bays
2
Building
1926

Plan

Traced from the remodel drawings. Select a room to jump to its description.

Scroll the plan sideways to see both suites →

Room by room

224

Wet Lab

Blood sample processing, point-of-care analyses, and ELISAs. Casework wraps three walls with three seated work positions built into it. A four-foot biosafety cabinet with UV, two undermount sinks, purified water at the bench, an emergency eye wash, a glassware drying rack, and refrigerated storage.

224A

Clinical Research Bay 1

The lab's primary testing bay. Its two new walls are built as a rated acoustic assembly, which quiets the bay against the wet lab and the changing room. Wall-mounted display, privacy curtain, and a changing room immediately next door.

224B

Storage

Consumables, supplies, and equipment carts, kept out of the testing and bench areas.

224C

Passage

The internal connection between the wet lab and the clinical side, lined with six lockers for participants' personal belongings and a bench. Samples and people move between the two halves of the lab without going back out to the corridor.

224D

Changing Room

A private place to change before a visit, with a bench, hooks, lockers, and a pocket door that opens straight into Bay 1.

220

Lab

Exercise and metabolic testing, and the shared working room. Casework runs along two walls with two seated work positions built into it, alongside adjustable-height desks, monitors, a sink run, and a glassboard for working through an analysis with whoever is in the room.

220A

Clinical Research Bay 2

The second testing bay. A patient chair, a monitor on a wall mount, blackout shades, an accessible sink, and a ceiling-tracked privacy curtain.

220B

Interview Room

Where consent, questionnaires, and interviews happen, away from the equipment. A conference table, seating, a glassboard, and a shade on the window.

Shared cell laboratory

Bardeen 280

The cellular work happens in Bardeen 280, a shared wet laboratory a short walk from the suites. Cell culture, live-cell imaging, and bioenergetic phenotyping are all run there, on a Nikon Ji and a Seahorse XF Mini.

Keeping the two apart is deliberate. Sample processing stays beside the participant, in Wet Lab 224, while the longer cell experiments sit in a room built and shared for that purpose.

Details

Drawn into the remodel rather than added later.

Photographs will replace the plan once the space is finished.